Plant intelligence for water and wastewater

Smarter plants. Safer water. Clearer decisions.

Hydro-Suite reads a plant's own data, explains what changed in plain words, sizes the fix, and gives the operator a short spoken job in Hindi or English. An engineer always signs off. Nothing writes to equipment.

  • Hindi and English
  • Two-person sign-off
  • Read-only by design
An illustrated treatment train: equalisation tank, aeration basin, clarifier and contact tank, with sensors that pulse EqualiseAerateSettleDisinfect
Oxygen trending lowAeration basin · check the blower first
Signed off by 2 engineersReady for the operator
पहले ब्लोअर जाँचें।Spoken job · Hindi or English

Illustration

Why Hydro-Suite

Plants produce plenty of data. The person on shift still has to guess what changed, why it matters, and what to do first. We turn the data into a clear, spoken job that an engineer has signed off.

18plants in the demo: six real, twelve extrapolated from them, each one labelled
31engineering calculators behind every size, dose and load
2engineers must approve a change before anyone acts on it
0paths from the software to a pump, valve or PLC

How it works

One loop, from a sensor to a signed-off job.

FlowOxygenpHCODSolids
Plant dataevery reading, labelled real or extrapolated
flag threshold
Tags that moved the score
Dissolved oxygen
Reference oxygen probe
Outlet pH
Why was Tuesday flagged?
Three readings moved together: dissolved oxygen, the reference probe and outlet pH. Likely causes, to confirm with the operator and the lab: a blower problem or a probe fault.
Numbers checkedReference note citedHypothesis, not a verdict
AHold flow at design
BBlower + hold flow
CRaise sludge return
Draft · not applied
Request: engage standby blowerNeeds two engineers to approve. Running cost: not estimated.
Engineer 1signed
Engineer 2signed
Ready for the operator
Asset code matched
  • Check the dissolved oxygen
  • Look at the blower's current
  • Tell your engineer what you find
Recorded · who, what, when

Who it is for

From a town's sewage plant to an industrial effluent plant.

The demo plants span the kinds of sites you run. Keep scrolling.

01

Municipal sewage

Typical plants

Activated sludge, SBR and MBBR, MBR and IFAS, UASB and lagoon

What it watches

Dissolved oxygen and ammonia, mixed-liquor solids, outlet BOD, COD and TSS, monsoon and peak flow surges

What the team gets

A flagged day explained, a surge tested on the twin, a short spoken job for the shift

02

Pharma and chemical

Typical plants

Pharma effluent with MBR, chemical effluent

What it watches

COD and pH swings, shock loads from batch discharges, outlet against the limits you enter

What the team gets

Which tags moved the score, what a 2x load does to each unit, sign-off before any change

03

Textile and paper

Typical plants

Textile effluent, paper-mill effluent

What it watches

Organic load and solids, salts and dissolved solids, pH and temperature, sludge handling

What the team gets

Early warning on drift, a twin per plant, Hindi and English for the floor

04

Food, dairy and distillery

Typical plants

Food and dairy effluent, distillery effluent

What it watches

High organic load and its swings, anaerobic and aerobic stages together, foaming and bulking risks, seasonal peaks

What the team gets

Load tests before the season, reference notes with citations, checklists the operator ticks

05

Electroplating and refinery

Typical plants

Electroplating effluent, refinery effluent

What it watches

Physico-chemical treatment steps, ion-exchange stages, pH control and dosing, outlet against discharge limits

What the team gets

Doses and sizes from validated calculators, probe drift cross-checks, a record of who did what

The demo pack includes plants of each kind. What is watched at your plant depends on the tags it reports.

The platform

Try it. Six tools, working as one loop.

Built to be trusted

The plant keeps its safety authority. We keep the rules short and hard.

Numbers come from the data

Every figure in an answer is checked against what a tool returned. An answer with an unverified number is replaced by the verified facts.

Read-only by design

There is no path from Hydro-Suite to a pump, valve or PLC. A change is a request that two engineers approve, then a person acts.

The PLC stays in charge

Safety interlocks, emergency stops and relief valves are never in scope. The assistant refuses to advise bypassing any of them.

Real and extrapolated, labelled

Six plants are real data and twelve are extrapolated from them. Every plant, screen and answer says which one it is.

Isolation by company

Customers see only their own plants. The limit is enforced on the server and below the assistant's data tools, and fails closed.

A record of every step

Who raised a task, who approved it, who did it and what they recorded. Staff support access is audited.

Evidence

What we measured, and what we do not claim.

Early warning on the validation pack

A fixed threshold of 3.5, not tuned on the labels. 18 plants, 6,192 scored plant-days, 125 catalogued events.

0.907row precision
0.833row recall
0.936event recall
117 of 125 events
0.228false-alarm episodes
per 30 plant-days

Caveat: events are injected into series from 18 plants, six real and twelve extrapolated. This is a check on the method, not a promise for a new plant.

What we are careful not to claim

  • We do not forecast outlet quality better than a plant's own recent average. Walk-forward tests show our models add little beyond a 28-day mean on this data, so we do not sell them as a forecast.
  • The twin is a design-basis model, not a measurement. It shows what a design should do under a scenario, and says so on every result.
  • We do not estimate running cost until a tariff, chemical or energy price is supplied.
  • We do not certify compliance. Results do not prescribe process changes.

The model keeps improving as new days arrive, and a new model is promoted only if it does no worse than the current one.

Where we are

What works today, and what comes next.

Working today

The core loop

Fleet scoring, flagged-day explanations, digital twin stress tests, EnviroSaathi with its checks, the Hindi voice coach, role-based tasks and sign-off, and company workspaces.

Next

Tasks the AI raises itself

Today a person raises a task. Next, the diagnosis agent drafts one when it finds a failure, and an engineer reviews it. Also: live plant data from the edge, and peak hydraulic loading from rainfall.

Later

Closer to the plant

An edge connector that reads real PLC and analyser data, with the same read-only rule. Any step beyond advisory mode would need a twin whose error is measured on that plant, and two-person sign-off.

Bring us one plant.

Tell us what you run and what keeps you up at night. We will show you the platform on a plant like yours.